Water supply system
Connection method: double clamp connection, groove connection
Pipe material: S31603 stainless steel
Project summary
Futong City series is an early developed and large-scale community in the Bihai area, with a wide variety of housing options. The total construction area of the first phase is 168,000 square meters; the total construction area of the second phase is more than 80,000 square meters; the total construction area of the third phase is 148,600 square meters. It fully demonstrates the characteristics and scale of early development, providing residents with spacious living space and diverse living options.
Construction site