Water supply system
Connection method: double clamp connection, groove connection
Pipe material: S30408 stainless steel
Project summary
The total construction scale of Huafa Cross Gate International Garden Project (A8 plot) is 207,238.13 square meters, of which the above-ground construction area is 144,994.73m and the underground construction area is 62,243.4 square meters. The project is located in the Wan Chai area of the Cross Gate Business District, and consists of a shopping center, an office hotel tower and two residential towers. The overall planning is different from traditional commerce. It will be presented with the image and function of a one-stop urban complex with modern, full-featured, mid-to-high-end positioning, creating a new consumption hotspot and business landmark in the region.
Construction site